Installed capacity : 2 X 63 MW
Design energy : 515 MU
Project cost : Nu. 12.52 billion
Incorporation : May 13, 2008
COD : February 2015
Shareholder : DGPC (59%), Tata Power (26%), NPPF (15%)

Our Mission & Vision


"Dagachhu Hydro Power Corporation Limited is dedicated to the sustainable generation of hydroelectric power. Our mission is to provide reliable renewable energy solutions that empower communities while preserving the natural
heritage of Bhutan. We envision a future where clean, affordable, and environmentally conscious energy drives progress for all".

INTRODUCTION


Dagachhu Hydropower Project, located in the south-western part of Bhutan
under Dagana Dzongkhag (District), is a run-of-the-river scheme developed
on the left bank of river Dagachhu, located between 10.5km and 20.2km
upstream of the confluence with the Sunkosh. ​The elevation of the project area
and the catchment area ranges from 500m to 4,000m above the sea level. The feasibility study of the 126 MW Dagachhu Hydropower Project was conducted
by M/s Bernard Engineers, Austria in 2006 and

Click here to learn more

OUR MANAGEMENT

Technical Non-technical Security Total
44
24
15
83

GENERATION REPORT

Year Gross Generation(MU) Revenue Generation(Mn)
2025
364.797
1139.972

Quick Links

Scroll to Top